Inside the Data Center
Inside the Data Center

Inside the data center

Every search, video and AI answer runs in a building packed with computers, power gear and cooling. Walk through one, meet the biggest real sites, design and run your own, and see who owns the most.

Since you opened this page, the world's data centers have used 0.0MWh About 15 MWh every second, from the IEA estimate of 485 TWh used in 2025. A typical US home uses about 10.5 MWh in a year.
12,960data centers in 181 countriesData Center Map, Nov 2026
1,300+hyperscale sites, 58% run by Amazon, Microsoft, GoogleSynergy Research
1+ GWIT power at the largest AI campus, Amazon's Project Rainier in IndianaEpoch AI estimate, Oct 2026
~20MH100-equivalent AI chips in use worldwideEpoch AI, mid-2026

Anatomy of a data center

U16 Patch panel

A data center is a building designed around three flows: electricity in, heat out, and data in both directions. Click any part of the building, or switch on a flow to trace where it goes.

DATA HALL COOLING Grid Substation Generators Meet-me room NOC Switch gear UPS CRAH Racks CDU Chillers Cooling towers Carrier fiber from the internet

Scroll sideways to see the whole building.

Inside the data hall

Server racks

    The four systems inside

    U15 Leaf switch

    Every data hall runs on the same four systems. Compute does the work, storage remembers, the network connects everything, and power and cooling keep it all alive.

    CPU or GPU?

    A server CPU has dozens of powerful cores (the biggest server chips now have 128 to 192) and is good at varied, step-by-step work: websites, databases, operating systems.

    A GPU has thousands of simpler cores that apply the same math to huge blocks of numbers at once. AI is mostly that kind of math, multiplying large grids of numbers, so AI data centers are built around GPUs and similar accelerators such as Google's TPUs and Amazon's Trainium.

    Race the two chips on a job that splits into 1,024 independent pieces, then on one where every step needs the answer from the step before.

    CPU, 16 fast coresready
    GPU, 1,024 simple coresready

    Each square is one piece of work. Time is in clock ticks; a GPU core is slower per tick but there are far more of them.

    One AI rack, by the numbers

    NVIDIA's GB200 NVL72 is the rack many 2025–2026 AI clusters are built from. It behaves like one giant GPU.

    GPUs
    72
    Blackwell, plus 36 Grace CPUs
    Compute trays
    18
    plus 9 NVLink switch trays
    GPU-to-GPU link
    1.8 TB/s
    per GPU, 130 TB/s across the rack
    Power draw
    120–140 kW
    about 10× a typical cloud rack
    Cooling
    Liquid
    cold plates on every chip
    Next: Vera Rubin (late 2026)
    170+ kW
    per Meta’s first racks; 600 kW Kyber racks planned for 2027

    Counting AI chips

    Chips differ, so analysts convert them into H100-equivalents: how many NVIDIA H100 GPUs it would take to match a chip's 8-bit math speed.

    By Epoch AI's count, the world had about 15 million H100e in January 2026, drawing more than 10 GW, and roughly 20 million in use by mid-2026. About 27.6 million had been sold by June 2026.

    Only five companies (Amazon, Google, Meta, Microsoft and Oracle) held an estimated 71% of all AI compute at the end of 2025. See who owns what.

    Types of data centers

    U14 Storage shelf

    Data centers range from a closet with a few servers to AI campuses that draw as much power as a city. Pick a type to see where it sits on the scale.

    From closet to gigawatt

    IT power per site, log scale. 1 MW powers roughly 1,000 US homes.

    Tiers: how much downtime is allowed?

    The Uptime Institute rates a facility's design from Tier I (one path for power and cooling, no spares) to Tier IV (everything doubled, so any single failure is survivable).

    Most colocation and cloud facilities are built to Tier III: every component can be serviced without switching off the IT load.

    Availability figures are the commonly cited design targets for each tier.

    Major data centers, up close

    U12 1U server

    Twenty-one real sites, from Google's first company-built data center and a server farm on the seabed to AI campuses that went from bare land to nearly a gigawatt in under two years. Pick a site for its specs, or tick up to three to compare.

    AI factory Cloud and internet Record-breaker or experiment

    Power running today, MW

    Epoch AI estimates of IT power for the US AI campuses; company figures for Cortex, Yotta and Inner Mongolia. Pick a bar for details.

    The AI build-out race

    IT power at nine of the biggest AI campuses, estimated from satellite images, permits and company statements. Each step is a building coming online; dashed lines are projections.

    Show as a table

    Source: Epoch AI, Frontier Data Centers, estimates updated July to November 2026.

    Sandbox journeys

    U11 GPU server

    Follow work through the machine. Send a request across the internet, watch GPUs turn your prompt into an answer, or train a model on a cluster.

    What are you doing?
    Where is the data center?

    Scroll sideways to see the whole path.

    Event log

    Where the time went

    Build your own data center

    U7 Expansion bays

    Build a data center step by step: choose a place, pick the computer parts, fill a room with racks, plug it in, keep it cool, and copy it into a campus. Then run it for a year and get a report card. Every choice changes the bill, the carbon, the water and whether it stays online.

    1. Choose a starting design below, or start from an empty hall.
    2. Go through the six steps on the left. The picture on the right changes as you do.
    3. Press “Run one year” at the bottom to see what happens and get your grades.
    Words to know
    Rack
    A tall metal cabinet, about the size of a fridge, filled with servers.
    Hall
    A big room full of racks, with cooling and power around it.
    GPU
    A chip that does the math for AI very fast, thousands of sums at once.
    RAM
    A computer’s short-term memory: the desk where it keeps the work it is doing right now.
    Storage
    Where data is kept for the long term, on hard drives or flash. The warehouse.
    kW and MW
    Units of power. 1 MW is 1,000 kW, about what 800 US homes use on average.
    H100e
    AI computing power counted in NVIDIA H100 chips. 1,000 H100e is the math of 1,000 H100s.
    PUE
    Total power divided by computer power. 1.2 means 20% extra goes to cooling and losses.

    Where to build. Cool weather makes cooling cheap, cheap and clean electricity lowers the bill and the CO₂, and the local grid decides how much power you can get.

    Average temperature by month

    Site figures are rounded estimates for this sandbox. Fast grid power is a rough guess at what the local utility could connect within about two years.

    Swipe sideways to see the whole hall.

    Dot on each rack: green cooled, amber warm, red overheating

    Design check

      Run it for a year

      How the sandbox works

      Each air handler adds 200 kW of cold air to the room. Without containment a rack can take only about 12 kW from room air; with contained aisles, about 25 kW. In-row coolers cover 70 kW within two positions, and CDUs move 1.2 MW of liquid cooling within six positions, both across the two rows that share a cold aisle. Liquid-cooled GPU racks send 80–95% of their heat to liquid. GPU racks use rounded vendor specs: 8-bit math is compared with an H100’s 1,979 dense TFLOPS (Vera Rubin figures are early), and the biggest model assumes 70% of GPU memory holds 8-bit weights. Cloud servers draw 500 W plus 0.1 W per GB of RAM, cost $14,000 plus about $20 per GB of RAM, and host one small VM per core or per 8 GB of RAM, whichever runs out first. Storage racks hold 36 TB hard drives, 122 TB QLC or 30.7 TB TLC flash drives; a checkpoint of a 405B-parameter model with its optimizer state is about 5.7 TB. Monthly cooling power follows each site’s average temperatures, estimated wet-bulb temperature, the cooling plant and the air temperature you choose. Power losses run 3.5–5% depending on the backup design. Costs use about $3M per MW for the building, $3.5–6M for electrical gear and $1.6–3.2M for cooling, plus the racks. AI compute uses H100-equivalents (32 per H100 rack, about 180 per GB200 rack, about 630 per Vera Rubin rack). In the yearly run, each generator fails to start 3% of the time, less with longer battery runtime because operators can retry. Everything is a simplified model for learning, not for engineering.

      Experiment lab

      U5 KVM console

      Two quick experiments: test airflow in a cold aisle, or cut the utility feed and watch the backup systems take over. To design a whole facility, use the Build sandbox.

      18 °C38 °C
      Each dot is a parcel of air, colored by temperature.
      All inlets in range
      Server inlet temperatures, top to bottom. The line marks 27 °C, the top of ASHRAE's recommended range.

      Without containment, hot exhaust curls over the top of the rack and gets pulled back into the top servers. Missing blanking panels let it leak straight through the middle.

      Who has the most

      U4 Compute server

      Counting buildings, the United States is far ahead of every other country. Counting AI chips, five cloud companies own most of the world's computing power, and nearly all of the biggest AI campuses are in the US.

      Circle area shows the number of data centers listed for each country. The US has more than the next 18 countries combined.

      Ranking

      Show as a table

      Source: Data Center Map, 12,960 listed facilities, November 2026. Counts measure buildings, not capacity: one AI campus can outweigh dozens of small sites.

      The numbers

      U2 UPS

      How much power data centers use, how efficient they are, and where it is heading. Hover or tap any chart for exact values, or open its table.

      Electricity used by the world's data centers

      Demand roughly doubles by 2030 in every IEA scenario. In the base case it reaches 945 TWh, slightly more than all of Japan uses today.

      Measured and estimatedBase caseOther scenarios
      Show as a table

      Source: IEA, Energy and AI and Key Questions on Energy and AI. Lines join the IEA's 2025, 2030 and 2035 values.

      Where the growth lands

      Data center electricity by region, 2025 and the IEA base case for 2030 (TWh). The US and China account for most of the increase.

      20252030 base case
      Show as a table

      Source: IEA regional data, via AESOLAR.

      Efficiency has stalled

      Average PUE fell fast until about 2013, then flattened. Hyperscale fleets run near 1.1 while older sites drag the average.

      Show as a table

      Source: Uptime Institute Global Data Center Surveys, years the survey reports.

      Rack power is exploding

      Power per rack, kW. A typical rack drew about 8 kW in 2020; NVIDIA's 2027 racks are specified at 600 kW.

      Show as a table

      Sources: Vertiv via TweakTown, Moduledge, Tom's Hardware. Bars show the middle of each reported range.

      What one AI prompt costs in energy

      A short text prompt uses about as much electricity as a 10 W LED bulb running for a minute or two. Long reasoning, images and video use far more.

      Show as a table

      Sources: Google (2025), OpenAI's 0.34 Wh as reported by CBS News. Household items are simple arithmetic; log scale.

      Test yourself

      U1 PDU

      Eight questions on what you just explored, and a dictionary of the jargon.

      Data center dictionary

      About Inside the Data Center

      An interactive guide to data centers: compute, storage, cooling, power, types, sandbox journeys, experiments and who owns the most AI compute.

      Topic: Data centers, cloud and AI computing · Format: interactive guide and sandbox · Free, no sign-up · Updated 2026-11-06 · By Prince Vincent, WikiNano · Last reviewed 2026-11-06.

      Inside this page

      Common questions

      How much electricity do data centers use?
      The IEA estimates about 415 TWh in 2024 and roughly 485 TWh in 2025, around 1.5% of the world's electricity, with growth driven by AI.
      What is PUE?
      Power usage effectiveness: the total power a site draws divided by the power its IT equipment uses. 1.0 would be perfect; the 2025 industry average was about 1.54.
      Are the AI answers on the page live?
      No. The AI inference lab plays written sample answers so you can watch how a request flows through the hardware. The simulation itself runs live in your browser.

      Sources and further reading